Math
Math, 18.10.2019 06:00, aswinkumarmishra

10 man begain to work together on a job , but after sometime 4 of them left the job . as a result the job could have been completed in 40 days is completed in 50 days . how many days after the commencement of the work did the man leave .

answer
Answers: 1
Get

Other questions on the subject: Math

image
Math, 18.08.2019 01:00, vishal4838
Example 11: for a faulty thermometer upper and lower points are found to be 99 c and -2respectively. what is the correct temperature if this thermometer reads 38 °csolution​
Answers: 3
image
Math, 18.08.2019 03:00, veer1277gmailcom
Abody starting from rest and executing an accelerated motion covers a distance of 6m in 4seconds.calculate: (a) the acceleration(b) the final velocity​
Answers: 3
image
Math, 19.08.2019 16:00, daniya0
On a shelf of length 7 metre mathematics and english books are to be arranged mathematic books occupy four metre then find the fraction of shells left for english books and second by what fashion does the space for mathematics books access the space for english books​
Answers: 2
image
Math, 19.08.2019 22:00, Vsinghvi
Arrange the following rational numbers in descending order; 9/( 11), (-7)/( 9), 5/( 8), 2/( 3), 1/( 3), (-5)/( 8)
Answers: 1
Do you know the correct answer?
10 man begain to work together on a job , but after sometime 4 of them left the job . as a result th...

Questions in other subjects:

Konu
Computer Science, 21.03.2020 19:10
Konu
Geography, 21.03.2020 19:10
Konu
Chemistry, 21.03.2020 19:10
Total solved problems on the site: 19555156